IHD — International Horizon Development

Regulatory engineering consultancy — France and Spain

Size to the text in force, and build the file that holds up

Two public catalogues of standardised operation sheets coexist; only one is enforceable. We work from that one, in the version in force on the operation's commitment date.

IHD is an independent regulatory engineering consultancy specialising in energy efficiency. We analyse the regulation applicable in each market, we size installations and we assemble the funding files for energy retrofits:

France —
energy savings certificates (CEE), standardised and project-specific operations
Spain —
certificados de ahorro energético (CAE), sistema CAE
Switzerland —
Programme Bâtiments, co-funded by the Confederation and the cantons, together with the complementary cantonal programmes
Belgium —
primes Habitation in Wallonia, primes Renolution in Brussels, Mijn VerbouwPremie in Flanders
Canada —
ÉcoPerformance and Technoclimat in Quebec, together with the provincial and federal energy-efficiency programmes
Tunisia —
Energy Transition Fund support for energy-efficiency and renewable-energy investments

We assess each project case by case and support the project owner from the study through to monetisation with the delegated party or the agent.

We deliver reliable, defensible sizing reports, issued under the consultancy's title block and countersigned by the qualified installer. Our scope covers the four sectors of the operation catalogues — industry, non-residential buildings, agriculture and collective housing — in standardised as well as project-specific operations.

Written by Oussama Triki, President of IHD · updated

Desk-based pre-study workspace: a laptop open on a calculation spreadsheet, next to a printed document and a pen.

What we cover, as proven by the catalogue

For each sector, the families of operations actually listed in both catalogues, French and Spanish.

Count taken on 9 September 2026 for France and on 7 September 2026 for Spain.

Plant room on an industrial site: air compressor, insulated pipework network and pressure gauges. A technician, seen from behind, points a thermal camera at a pipe joint.

Industry

Refrigeration and utilities form the core of both catalogues, from compressed air to waste heat.

France, IND family: 32 codes as at 9 September 2026
  • Destratification and rooflighting
  • High-efficiency decentralised heating
  • Compressed air: compressor, dryer, sequencer
  • Heat recovery on compressors
  • Steam: economiser, condenser, micro-modulating burner
  • Refrigeration: floating pressure, free cooling
  • IE4 motors, variable speed drives
  • Waste heat: conversion, storage
  • Insulation of industrial plant surfaces
  • Performance indicator metering
  • Electric injection moulding machine
  • Electric industrial boiler
  • Insulation, overseas territories
Spain, IND family: 28 sheets as at 7 September 2026
  • Industrial refrigeration: refrigerant, compressor, rack
  • Condensing and evaporating pressure
  • Refrigeration heat recovery
  • Pipework insulation, UNE 92330
  • Heat pumps, LED, compressed air
  • Motors, drives, pumps, inverters
  • Solar thermal, heat between processes
  • Desalination: energy recovery
Plant room in a non-residential building: two heat pumps on plinths, insulated headers and valves on the wall. In the foreground, a survey notebook and a digital pressure gauge on a table.

Non-residential buildings

A secondary school is non-residential, a boarding school is residential. The routing is decided at the site survey. Commercial refrigeration and building management dominate.

France, BAT family: 54 codes as at 9 September 2026
  • Envelope, curtain walling, reflective roofs
  • Solar shading, overseas territories
  • CO₂ commercial refrigeration, closed cabinets
  • Refrigeration: floating pressure, efficient condensing
  • Rooflights and light pipes
  • Building management system
  • Extract and heat recovery ventilation
  • Air destratification, free cooling
  • High-performance fan coil units
  • Data centres, grey water
  • Heat networks, geothermal
  • Collective air-to-water and water-to-water heat pumps
Spain, TER family: 38 sheets as at 7 September 2026
  • Envelope and insulation
  • Windows and joinery
  • Deep renovation
  • Indoor lighting, roads and sports areas
  • Building automation
  • Heat pumps, solar thermal
  • Refrigeration: compression, condensing, control
  • Refrigeration: recovery and storage
  • System hybridisation
  • Heat network, ventilation
  • Drives, inverters, pumps
Inside a glass horticultural greenhouse: rows of potted plants, air circulation fans hung from the frame and a blue unit heater mounted high up.

Agriculture

The schemes diverge: greenhouses, livestock and farm refrigeration in France, two measures in Spain as at 7 September 2026. Feasibility depends on the country.

France, AGRI family: 28 codes as at 9 September 2026
  • Greenhouses: thermal screens, double skin
  • Greenhouses: efficient cladding and insulation
  • Greenhouses: dehumidification, condensing heat recovery
  • Bioclimatic water storage, efficient boiler
  • Poultry housing and milk cooling tank
  • Farm refrigeration: floating pressure, heat recovery
  • Motors, drives, agricultural heat pumps
  • Solar drying, silo ventilation
  • Tractor engine tuning
Spain, AGR family: 2 sheets as at 7 September 2026
  • Greenhouse thermal screens
  • Heat recovery from milk
Flat roof of an apartment block: two heat pump outdoor units on mounts, insulated pipework running to a riser opening, buildings on the horizon.

Residential

France funds the depth of renovation, Spain also funds household equipment and energy poverty measures. The same project is assembled differently.

France, BAR family: 56 codes as at 9 September 2026
  • Envelope: lofts, walls, floors, windows
  • Flat roofs, insulating shutters
  • Balancing, power flushing, consumption monitoring
  • Energy performance contract, services
  • Solar thermal, combined solar system
  • Biomass boilers and appliances
  • Humidity-controlled, heat recovery, hybrid ventilation
  • Air-to-air, hybrid heat pumps, thermodynamic water heater
  • Geothermal, heat network
  • Major renovation: single house, apartment
  • Whole-building renovation of collective housing
  • Collective air-to-water and water-to-water heat pumps
Spain, RES family: 44 sheets as at 7 September 2026
  • Envelope and insulation
  • Windows and joinery
  • Deep renovation
  • Solar thermal, home automation
  • High-efficiency household appliances
  • Boiler replaced by a heat pump
  • System hybridisation
  • Connection to a heat network
  • Ventilation
  • Energy poverty, suffix S

How an operation unfolds

Always the same order, from the first document requested to the processing of the file.

  1. The documents, before the visit

    You send us whatever building documents you have. We tell you straight away what is missing to assess the operation.

  2. Pre-study, then the visit

    The pre-study is carried out on documents, without disrupting activity on site. The site survey completes what the documents do not say.

  3. The study and the recommendation

    Each installation receives a study of its own, followed by an equipment recommendation that meets the requirements of the sheet.

  4. Summary, quotation and Part A

    A clear summary for the decision-maker, then a quotation and a sworn statement consistent with the study, ready to be signed.

  5. Through to monetisation

    We follow the file through to monetisation with the delegated party or the agent, with documents that are consistent from the study to the installation.

When the text requires a signed preliminary study

Sheet IND-UT-141 “Electric industrial boiler”, in force since 5 September 2026, requires a preliminary sizing study, dated and signed by the contractor or an engineering consultancy, handed to the beneficiary on the commitment date. Its content is set point by point.

  1. Point I: identification, company name, SIREN, addresses
  2. Point II: one year of history, a two-month campaign or a simulation
  3. Point III: heat demand by use, capacity and temperature
  4. Point IV: boilers before and after, efficiency, annual savings

The author of the study is named in the sworn statement, with its company name and SIREN. The operation is subject to on-site inspection, and the study is among the criteria checked: a sound study directly protects the monetisation.

The conditions are checked before any promise: full electrification with no fuel-fired boiler other than for back-up, replaced capacity below 20 MW, efficiency of at least 99%, fluid above 110 °C, a twenty-two-year commitment.

A neutral report that leaves you free

Our sizing report commits you to no one. You keep full control over the choice of delegated party and installer.

  • Independent of any delegated party
  • Based on the version of the sheet in force
  • Defensible before an inspector
  • Consistent with the quotation and the installation

A well-sized installation performs as intended, and a well-justified file is monetised without being sent back. That is what our report secures.

What we secure for you

A CEE file is won or lost on its justification. Our studies are built to hold up during processing and inspection alike.

  1. 01

    Accurate sizing

    An installation neither undersized nor oversized, which delivers its performance all year round.

  2. 02

    Justified values

    Every result in the report is justified and verifiable, by the delegated party and the inspector alike.

  3. 03

    The right version of the text

    The sheet is applied in the version in force on the date the operation is committed.

  4. 04

    Complete consistency

    The study, the quotation and the installation say the same thing, which avoids requests for additional documents.

  5. 05

    Protected monetisation

    A sound file from submission onwards, so that the expected funding is not called into question.

What is changing right now

The regulatory points in motion, each dated to the day we checked it at source.

  • The sworn statement changed on 1 July 2026

    The order of 21 December 2025 adds to Part A of the sheets: operation cost excluding and including VAT, and public aid other than CEE. The criterion is the commitment date, the quotation's acceptance. We check the signed Part A is the one in force.

    Checked at source on

  • One sheet requires a preliminary sizing study

    The order of 1 September 2026, in the Journal officiel of 4 September, creates sheet IND-UT-141, electric industrial boiler. It requires a preliminary study signed by the contractor or an engineering consultancy, named in the sworn statement. Hybridisation without removing the fuel-fired boilers is excluded.

    Checked at source on

  • 27 sheets proposed for withdrawal, consultation open until 7 October

    A draft order, put to public consultation from 16 September to 7 October 2026, provides for the withdrawal of 27 standardised operation sheets. Until the order is published, they remain in force.

    Checked at source on

  • The withdrawal of fossil fuels is enacted, not just announced

    The order of 18 August 2025 withdrew four gas sheets on 1 September 2025: collective absorption heat pump, individual gas water heater, non-residential absorption heat pump, non-residential gas engine heat pump. They can no longer be funded. The scheme is exiting fossil fuels, even under the heat pump name.

    Checked at source on

  • The BACS obligation is postponed to 2030, not 2027

    Above 290 kW of heating or cooling, a non-residential building must have a building automation and control system, deadline 2025. For existing buildings from 70 to 290 kW, the deadline is postponed to 1 January 2030 by decree no. 2025-1343 of 26 December 2025.

    Checked at source on

  • Spain: CAE for 2023 actions are reaching expiry

    Article 11.5 of Real Decreto 36/2023 allows a CAE to be registered up to three years after the action. According to the MITECO note of 2 June 2026, CAE for 2023 actions must be issued and settled before 31 December 2026. August is inhábil.

    Checked at source on

  • Spain: transport revised, four-month transitional period

    The resolution of 30 July 2026, BOE of 4 August 2026, revises TRA020, TRA040 and TRA050 with a four-month transitional period. They become read-only. The end date is confirmed with the Gestor Autonómico before any submission on the earlier version.

    Checked at source on

The Spanish side

Run by MITECO, the Sistema de Certificados de Ahorro Energético is processed with the Gestor Autonómico of each autonomous community.

2026, the first year without a transitional regime

Position as at 9 September 2026. The annual obligation is settled before 31 December: the transitional regime of 2023 to 2025 has ended. Added to this is the expiry under Article 11.5 of Real Decreto 36/2023, three years after the action. August is inhábil.

  • How a sheet changes

    By order in the Journal officiel, with its effective date and any transitional period.

    By resolution of the directorate-general: the catalogue of Orden TED/845/2023 is designed to be dynamic. Eight resolutions as at 9 September 2026.

  • Where the file is submitted

    With the obligated or delegated party carrying the operation.

    With the Gestor Autonómico of the autonomous community where the work is carried out, which rules on any question of time limits.

  • When a sheet is revised

    The order itself sets the effective date and the transitional period.

    Transitional period of at least three months, Article 3.2 of Orden TED/845/2023, on two conditions: submission during the period and proof that the works had started. The end date is confirmed with the Gestor Autonómico.

The operations we handle

The heat pump is only one diagnosis among others: the critical points of each sheet decide the fate of a file.

Collective heat pumps

Collective air-to-water, or water-to-water and brine-to-water heat pumps, in housing as in non-residential buildings, sized on the version of the sheet in force.

Industrial utilities

Compressed air, steam, motors, waste heat, plant insulation, electric industrial boiler with its preliminary study.

Refrigeration

Commercial and industrial refrigeration: condensing, floating pressure, free cooling, closed cabinets, CO₂. Including when the nameplate only gives the amperage.

Building management systems

Building management system in France, building automation in Spain: control and consumption monitoring for non-residential buildings.

Lighting

Indoor and outdoor relamping, rooflights and light pipes. In Spain, indoor lighting, then roads, tunnels and sports areas.

Greenhouses, ventilation and solar thermal

Greenhouse thermal screens and dehumidification, air destratification, heat recovery ventilation, solar thermal.

Where we work

Secondary schools including boarding schools, primary schools, EHPAD care homes, hostels and student residences, clinics, special education institutes, sports halls, apartment blocks, hotels, industrial sites and farms. For managing agents, the report arrives before the general meeting.

What you receive

  • Reliable, defensible sizing report
  • Equipment recommendation, including the scenarios set aside
  • Decision summary, written for the decision-maker
  • Document pack: quotation, applicable Part A, supporting evidence
  • Consistency check between quotation, report and installation

Our reports are engineering documents, drawn up from the site's real data. The amount of funding is determined in the study, sheet by sheet.

Six markets

The applicable scheme is not the same from one country to the next

We analyse the regulation in force on each market, we size the installations and we assemble the funding applications for energy renovation work.

  • France · Energy Saving Certificates (CEE)
  • Spain · Certificados de ahorro energético (CAE)
  • Switzerland · Le Programme Bâtiments (buildings programme)
  • Belgium · One scheme per region
  • Quebec · ÉcoPerformance, Technoclimat
  • Tunisia · Energy Transition Fund, Law No. 2015-12

Markets

News

What has just changed

All news

Tell us what is in the plant room

Send us whatever building documents you have. From the first exchange, we tell you whether the operation can be funded and what it takes to put the file together.

Address
200 rue de la Croix-Nivert, 75015 Paris

Form

Reply within one working day, no newsletter.

Your situation, what you expect, your timing.